Skip to content

Section 02 · How it works

How a record moves from start to finish.

Work that starts with a question moves through separate records: request, work order, material and result. Each keeps its own identity; the links between them do not break, and every step is written to the history.

RequestWork orderStock movementHistory
Illustration

How it works

From a fault report to closure.

Suppose a fault is reported on a pump. The request, the work order and the material used are separate records; they stay linked to each other.

  1. A need is noticed. An employee is concerned about a noise coming from pump PMP-04.
  2. A request is opened. The request is linked to the pump; a description and a photo are added.
  3. It is assessed. A new work order can be opened, or the request can be linked to a job that is already open.
  4. The work order is assigned. The owner and team are set. Assignment does not mean the work has started.
  5. It is carried out in the field. The technician completes the checklist and adds the reading and a photo.
  6. Material is recorded. The bearing used (6205) is deducted from the warehouse stock and added to the job's material cost.
  7. The result is assessed. If successful, the linked request is resolved; if the result is partial or failed, the request can stay open.
  8. The record stays in the history. Every step is written to the history with who did it, when, and on which record.

Press Play to walk through the steps.

Separate records

Assets, requests and work orders are not the same record.

Each carries its own number. The request describes the need, the work order the work to be done, and the asset card the equipment itself. A request can become a new job or be linked to a job that is already open; not every request needs a work order.

Mechanisms

Not a promise, but working mechanisms.

The six loops below show the product's six core movements. Each begins with a question, proceeds with a transaction, and leaves behind a verifiable record.

Handover of responsibility is never unrecorded

When an asset changes units, the assignment, location, and responsible person are updated in the same transaction. Both the one handing over and the one taking over see the same record.

Left behind: assignment record · signature · time

Movement in the field updates the record

When a tag is scanned, location and responsibility are recorded instantly. The team doesn't search lists to verify; the record already matches reality in the field.

Left behind: movement line · location · verification

A conflicting duty is caught in the process

The person who opens a request cannot also take on its approval. The conflict becomes visible at the moment of the transaction and the duty is split to a second role.

Left behind: separation-of-duties check · role separation

Tampering with the evidence chain is detected

Each record in the transaction history carries the digest of the one before it. If a record is changed, the chain breaks and the integrity check shows it.

Left behind: integrity check · 4/4 links

The lot nearing expiry moves to the front

The dispatch queue is built in expiry order; an approaching expiry date raises a warning before stock runs out.

Left behind: lot record · expiry warning

Planned maintenance generates its own work order

When the interval arrives, a work order is opened and assigned to its owner. Maintenance depends on a process, not on a reminder.

Left behind: work order · assignment · date

Next section · 03 / 11Assets and warehouseInventory, issue, warehouse and procurement: every asset's location and owner.

How does work run in your organization?

Let's work out together the scope for transferring your existing data and the connections you need. Tell us in the call which process you want to see; we'll plan the walkthrough around that workflow.

Request a discovery call